13 . What are the main installation differences between installing a timber deck and Deck25 Composite Deck (on a standard raised deck)?

Treated timber sub-frames are used for both in most applications.

Sub-Frame       A Deck25 deck sub-frame must be designed and built to last.  This includes treating and sealing the part of the post that is in contact with the ground and up to 100mm above ground level.  The ground air interface is where treated posts are most susceptible to rot.  Galvanised steel post anchor systems are excellent.

Joists   Joists will rest on a primary bearer or purlin system.  Joists must be spaced at 300 centres (250mm apart).  This generally only means an extra 4 or 5 joists over a deck which means very little cost, but makes a massive difference in terms of strength, eliminates bounce and increases the loading capacity of the deck dramatically.

Balconies, roof gardens and marine decks are constructed differently but joists should be no more than 250mm apart, self draining rubber shoes are recommended to elevate the sub-frame, ensuring that water flows freely below the joist or counter-batten frame system.

 

Latest News
One of our current projects is at a private dwelling, in Co Waterford, where we are installing a deck that is over 3 levels with 4 flights of stairs.  This site is ove

Find Out More
Request Call Back
Please enter your details below and we will get back to you.
Your Name
Telephone Number
How can we help you?
Contact Us
Telephone
Rep Ireland.
048 8774 1199
UK & NI.
028 8774 1199
INTERNATIONAL.
0044 28 8774 1199
Email