The Rua Red Art College is a contemporary building, the large percentage of glass walls create a modern and elegant appearance. Deck25 Black low maintenance composite decking was used to deck the entrance to the building. Black Deck25 used sparingly adds an extra element to the aesthetics of the building. It assists in enabling the building to appear stylish, pure and minimalist.
The Bistro to the front of the Theatre is an intricate part of the theatre experience. The deck to the front of the building adds another aspect to the building making it more inviting and interesting. Designer Black Deck25 was chosen for elegance, style and simplicity, enhancing the artistic and modern nature and purpose of the building.
The large deck to the side of the new school creates considerable extra useable space. It is an extension of the floor space of the school. It looks impressive visually, a contemporary feel. The main reason for installing the deck lies in the fact that the ground slopes steeply towards the river on the right. All other solutions bring with them their own problems and issues. The Deck25 handrail system creates a primary safety barrier. The perimeter fence is the secondary barrier (on the left.)
A brand new viewing gallery was constructed for the County Tennis Club in 2009. The viewing gallery overlooks the 9 tennis courts and is accessed from ground level via a large galvanised staircase and from the Members’ Club House on the 1st floor, through the patio doors. The elevated gallery allows excellent viewing of all the courts.
From the new headquarters of The Open University in Belfast, the BT building can be clearly seen. This roof top terrace decked with Deck25 Dark Brown, overlooks the multi million pound Victoria Square Shopping Centre and has views of Belfast City Hall and Belfast's Financial District.
